Introducing Koala Prospector! Bringing Waterfall Enrichment to Reps

Learn More!
Solar Power Systems

Solar Power Systems

We help our customers by sizing their solar power system to fit their needs and goals. Most of the time that goal is to size it as close as possible to eliminate the electric bill without overproducing from your solar power system. Q. What about the solar power system equipment? How long will it work? A. Photovoltaics or PV is not a new technology. There are solar power systems in California that are 40+ years old and still working. Solar panels today have energy production warranties for 25-30 years depending on the brand. Solar Inverters have 10 to 30 year warranties depending on brand and type. We install every system to last 30+ years. Q. How long does it take to install the system? A. The installation itself is pretty quick. Depending on the size of the job, and roof type, 1 to 3 days. Battery systems a little longer. One thing to keep in mind, the process to get the permit can take time. I think a lot of solar and electrical contractors will agree, Florida needs a standardized permit process to streamline solar permitting. It would seem every county and every building department has their own rules and all require different documents to obtain the permit. Most require plan review, I have seen this take less than a week and in some cases ( Charlotte County ) as much as 4 week to even be looked at for the first time.

Last updated on

About Solar Power Systems

Founded

2003

Estimated Revenue

$10M-$50M

Employees

51-250

Category

Industry

Electrical/Electronic Manufacturing

Location

City

Cape Coral

State

Florida

Country

United States
Solar Power Systems

Solar Power Systems

Find your buyer within Solar Power Systems

Tech Stack (0)

search