Tangsibji Hydro Energy
Tangsibji Hydro Energy Limited (THyE) is a 100% subsidiary company of Druk Green Power corporation Limited which was incorporated on April 25,2014 as a special Purpose Vehicle(SPV) for the implementation of the 118MW Nikachhu Hydropower Project. The Project is estimated to cost Nu.11.96 billion. Nikachhu Hydropower Project is a run-of-the-river scheme project located in Tangsibji Gewog,Trongsa. he Dam site is located in Lorim which is 6km downstream of the Chendibji chorten. design discharge of 25.45m 3 /s is diverted through 4 m finished diameter Head Race Tunnel which is 11,998.50 m long and hits two pelton turbine in the Power House generating as installed capacity of 118MW. he water is then discharged into the reservior of Mangdechhu Hydropower Project . The project will generate mean annual generation of 491.52 GWh from Nikachhu Power House and 323.77 GWh additional generation by Mangdechhu Power House on account of Nikachhu water. The construction period is 48 months. The project is being funded by ADB at debt equity ratio of 65:35.
About Tangsibji Hydro Energy
Estimated Revenue
$1M-$10MCategory
Location
Country
BhutanTangsibji Hydro Energy
Find your buyer within Tangsibji Hydro Energy